
Aralia Park — Photo Gallery
Aralia Park
Aralia Park is a freehold development inside Pearl City, Simpang Ampat, by Tambun Indah Land — 359 units in two 20-storey blocks, with 752 car park bays plus five OKU bays for the scheme.
Six layouts. On the 7th to 20th floors: Type A at 807 sq ft with two bedrooms, Type B at 1,022 sq ft and Type C at 1,194 sq ft with three bedrooms and a study area on C. The 6th floor carries the same three plans as A1, B1 and C1 at 775, 979 and 1,087 sq ft, trading the balcony for a terrace.
Every unit has a 10 ft ceiling and two to three car park bays. The building was 50% built as at August 2026, with CCC targeted for end 2027 and handover for the second half of 2028.
Quick answer: Aralia Park is a freehold high rise condominium development by Tambun Indah Land in Simpang Ampat, Penang. It offers 359 units, with 2 / 3 bedroom layouts, from 775 to 1,194 sq ft, already completed.
Development at a Glance
Everything below comes from the developer’s own material. These are the figures that are fixed at construction — renovation changes none of them, so they are worth checking before anything else.
- Developer — Tambun Indah Land
- Property type — High Rise Condominium
- Tenure — Freehold
- Land title — Commercial under HDA
- Blocks — 2 blocks
- Storeys — 20 storeys
- Total units — 359
- Lifts — 2 lifts
- Car parking — 2 to 3 bays per unit — 752 car parks plus 5 OKU bays
- Completion — CCC targeted end 2027, handover targeted 2H 2028
What the numbers actually say
The building holds 359 homes in total.
Lift provisioning is the number people notice daily and can never change afterwards: with 2 lifts in each of the 2 blocks. That works out to roughly 90 homes per passenger lift, which is about the industry norm.
Car parking is 2 to 3 bays per unit — 752 car parks plus 5 OKU bays. In a completed development this is one of the few things you cannot renegotiate afterwards, so check it against how many cars you actually run.
The development is finished and the certificate of completion has been issued, so what you view is what you get — no construction risk and no waiting period, but also no scope to vary the layout.
Unit Types
| Type | Size | Bedrooms | Bathrooms | Notes |
|---|---|---|---|---|
| A | 807 sq ft | 2 | 2 | 7th to 20th floor; approx 75 sq m |
| B | 1,022 sq ft | 3 | 2 | 7th to 20th floor; approx 95 sq m |
| C | 1,194 sq ft | 3 | 2 | 7th to 20th floor; approx 111 sq m, with a study area |
| A1 | 775 sq ft | 2 | 2 | 6th floor, with a terrace in place of the balcony; approx 72 sq m |
| B1 | 979 sq ft | 3 | 2 | 6th floor, with a terrace; approx 91 sq m |
| C1 | 1,087 sq ft | 3 | 2 | 6th floor, with a terrace; approx 101 sq m |
Six layouts across two towers. Types A, B and C run from the 7th to the 20th floor — 807, 1,022 and 1,194 sq ft, two bedrooms for Type A and three for B and C, with Type C adding a study area off the dining space. Types A1, B1 and C1 are the 6th-floor versions of the same three plans, slightly smaller at 775, 979 and 1,087 sq ft, and they trade the balcony for a terrace. Every unit has a 10 ft ceiling. All six plans are on this page.
Layout & Floor Plan
All 6 plans below are the developer’s own drawings.
- Type A is 807 sq ft, 2 bedrooms and 2 bathrooms — 7th to 20th floor; approx 75 sq m.
- Type B is 1,022 sq ft, 3 bedrooms and 2 bathrooms — 7th to 20th floor; approx 95 sq m.
- Type C is 1,194 sq ft, 3 bedrooms and 2 bathrooms — 7th to 20th floor; approx 111 sq m, with a study area.
- Type A1 is 775 sq ft, 2 bedrooms and 2 bathrooms — 6th floor, with a terrace in place of the balcony; approx 72 sq m.
- Type B1 is 979 sq ft, 3 bedrooms and 2 bathrooms — 6th floor, with a terrace; approx 91 sq m.
- Type C1 is 1,087 sq ft, 3 bedrooms and 2 bathrooms — 6th floor, with a terrace; approx 101 sq m.
Inside the Development
The developer does not publish a facilities list for this development. What is on record:
- Car parking — 2 to 3 bays per unit — 752 car parks plus 5 OKU bays
- Ceiling height — 10 ft
- Lifts — 2 lifts
- Storeys — 20 storeys
- Blocks — 2 blocks
Location & Connectivity
Simpang Ampat sits in Seberang Perai Selatan, the stretch of mainland Penang that has grown fastest since the second bridge opened. Aralia Park is inside Pearl City, Tambun Indah’s own township there, which is why the immediate surroundings are planned rather than piecemeal — Sri KDU International School and the township’s commercial rows are the local anchors. Batu Kawan with IKEA and Design Village is the nearest big retail draw, the Bukit Tambun and Simpang Ampat interchanges put the North-South Expressway on the doorstep, and the Penang Second Bridge takes you across to Batu Maung on the island.
- Pearl City township
- Aeon Mall Bukit Mertajam
- Batu Kawan, IKEA and Design Village Outlet Mall
- Sri KDU International School
- North-South Expressway — Bukit Tambun and Simpang Ampat interchanges
- Penang Second Bridge to the island
- Batu Kawan Industrial Park
Developer Background
Aralia Park is developed by Tambun Indah Land.
Compare Other Simpang Ampat Options
Looking at more than one project? Browse every new launch in Simpang Ampat.
Want to know the price for Aralia Park? PM us now — our consultant will contact you immediately.
Frequently Asked Questions
Is Aralia Park completed?
CCC targeted end 2027, handover targeted 2H 2028.
What unit types are available at Aralia Park?
6. Type A is 807 sq ft with 2 bedrooms and 2 bathrooms; Type B is 1,022 sq ft with 3 bedrooms and 2 bathrooms; Type C is 1,194 sq ft with 3 bedrooms and 2 bathrooms; Type A1 is 775 sq ft with 2 bedrooms and 2 bathrooms; Type B1 is 979 sq ft with 3 bedrooms and 2 bathrooms; Type C1 is 1,087 sq ft with 3 bedrooms and 2 bathrooms.
How many units does Aralia Park have?
359.
How many car park bays come with a unit at Aralia Park?
2 to 3 bays per unit — 752 car parks plus 5 OKU bays.
What sizes does Aralia Park offer?
Six layouts. Floors 7 to 20 carry Type A at 807 sq ft, Type B at 1,022 sq ft and Type C at 1,194 sq ft. The 6th floor carries Type A1 at 775 sq ft, Type B1 at 979 sq ft and Type C1 at 1,087 sq ft, each with a terrace instead of a balcony.
How many units and floors are there?
359 units in two 20-storey blocks, served by two lifts.
How much parking is there?
752 car park bays plus five OKU bays, working out to two or three bays per unit depending on the type.
Is Aralia Park freehold?
Yes. The land title is a serviced apartment title under the Housing Development Act.
When will it be handed over?
The developer records the build at 50% as at 11 August 2026, with CCC targeted for the end of 2027 and handover targeted for the second half of 2028.
| Type | Size | Bedroom | Bathroom |
|---|---|---|---|
| Type A | 807 sqft | 2 Bedroom | 2 Bathroom |
| Type B | 1,022 sqft | 3 Bedroom | 2 Bathroom |
| Type C | 1,194 sqft | 3 Bedroom | 2 Bathroom |
| Type A1 | 775 sqft | 2 Bedroom | 2 Bathroom |
| Type B1 | 979 sqft | 3 Bedroom | 2 Bathroom |
| Type C1 | 1,087 sqft | 3 Bedroom | 2 Bathroom |







Is Aralia Park Right For You?
Why Buy at Aralia Park
752 car park bays for 359 homes. That is more than two bays per unit with five OKU bays on top, which is unusually generous for a high-rise and is fixed at construction. In a township where nothing is walkable, the second bay is not a luxury — it is the difference between a two-car household working and not working.
Ten-foot ceilings across all six layouts, and a terrace on the sixth floor. Standard is closer to nine. The sixth-floor units get a terrace in place of the balcony, which is a genuinely different product from the same building — ask specifically for A1 or B1 if that is what you want, because there is only one floor of them.
It sits inside Pearl City, the developer’s own township. Tambun Indah has been building out this mainland township for years, so the roads, the shops and Sri KDU International School already exist rather than being promised. Batu Kawan, IKEA and the second bridge crossing are all a short drive.
Why Aralia Park May Not Suit You
Two lifts per block, twenty storeys. Against 359 homes across two blocks that works out to roughly ninety homes per lift. It is not alarming, but it is the tightest number in this development’s specification and it is the one you cannot renovate your way out of. Stand in the lobby at 8am before you commit.
Handover is targeted for the second half of 2028. The structure was about half built in August 2026 and the certificate of completion is targeted for end 2027, with handover the year after. That is a long runway. Read the SPA delivery clause rather than the brochure timeline.
It is a serviced apartment on a commercial title under HDA. The housing-development protections apply, but assessment and utility tariffs can follow the commercial schedule rather than the residential one. Ask the developer to confirm in writing which tariff applies before you budget the monthly cost.
Area Deep Dive: Simpang Ampat, Penang
Schools and campuses3
- SMK Simpang Ampat
- SJK(C) Valdor
- UOW Malaysia KDU Penang University College (Batu Kawan)
Healthcare3
- Hospital Sungai Bakap
- Columbia Asia Hospital Bukit Mertajam
- Hospital Seberang Jaya
Daily essentials3
- Design Village Outlet Mall
- AEON Mall Bukit Mertajam
- IKEA Batu Kawan
Transit and highways3
- North-South Expressway Bukit Tambun interchange
- Second Penang Bridge
- KTM Simpang Ampat
Distances vary by exact address and time of day. Drive your intended commute at peak hour before deciding.
Enquiry More Info Here
Our Team will reply immediately
Monthly Instalment Calculator
Enter any purchase price and adjust the figures below.
Estimate only, for your own planning. Not a loan offer. Excludes legal fees, stamp duty, insurance and maintenance.
Not sure of the price yet? PM us — our consultant will contact you immediately.