Astera Impian Hills type a terrace facade

Astera at Impian Hills, Ulu Tiram: A Freehold Terrace That Is Nearly Ready

Quick answer: Astera, the fourth phase of Plenitude’s Impian Hills township at Ulu Tiram, Johor, has 264 freehold gated two-storey terraces, each on a 22′ x 70′ lot. Type A offers 1,939 sq ft and three bathrooms, Type B 2,141 sq ft and four, both with four bedrooms. The first 156 are built; the rest follow in 2027.

Buyers used to waiting three years for a terrace will find Astera unusual, because much of it is already standing. The notes below draw on Plenitude’s e-brochure and the September 2026 project summary, and focus on what to check this close to handover. Plans and the specification list are on our Astera Impian Hills property page.

Two Batches on Two Timelines

Plenitude released Astera in two parts. Phase 4(1) opened in August 2024 with 156 houses, which the approved advertising panel splits into 104 of Type A and 52 of Type B. By the summary’s September update the structures were finished, and the certificate of completion was expected that same month.

Phase 4(2) followed in February 2025 with another 108 houses. Vacant possession for that batch is targeted for February 2027, with formal completion listed for May 2027. The brochure’s site plan numbers every lot of both batches in one running sequence, 264 in all, so ask which batch a given lot belongs to before you compare dates.

Type A Versus Type B

The two layouts share a lot of 22 by 70 feet, a porch for two cars and the same front-to-back order of rooms. Downstairs, the living room faces the porch, the dining area sits beside the staircase and the kitchen runs along the side wall. Next to the kitchen, at the back, is a fourth bedroom with its own bathroom, which is the room an elderly parent or a live-in helper would use.

The difference is at the back of the house. Type A, at 1,939 sq ft, stops shorter, so upstairs the two rear bedrooms share one bathroom. Type B, at 2,141 sq ft, extends further back and gives each of those bedrooms its own bathroom, making four in total. In both, the main bedroom faces the street with an attached bathroom, and a family area separates it from the rear rooms.

Corner lots come with a side garden and a small covered terrace, as the brochure drawings show. Ask about them early, as each block has only a few.

What the Specification Sheet Promises

The build is a reinforced concrete frame with brick or block walls, concrete roof tiles with a flat RC roof section, and aluminium-framed windows. Floors are tiled throughout the living spaces, the bedrooms, the bathrooms, the staircase and even the car porch. The master bathroom is tiled to the ceiling, the other bathrooms to at least 2.1 metres, and one wall of the wet kitchen to the same height.

Every house is wired for two air-conditioners, an automatic gate, an electric stove and fibre broadband, with one water-heater point per bathroom.

Astera Park and the Wider Township

The phase has its own park along one edge, and Plenitude has designed it for several ages at once. There is a children’s playground, outdoor exercise equipment for adults, calmer seating areas intended for older residents, a jogging track and open lawns large enough for games or community events. Ramps and specialised play equipment make it usable from a wheelchair, and the lighting is meant for evening walks.

Further out, the master plan reserves ground for a kindergarten, two schools and a multi-purpose hall, plus a future commercial zone, and places a community hall beside the sales gallery. These are sites on a drawing, so check their status before counting on them.

The Fine Print Near Completion

A nearly finished house changes the contract questions. The summary sets defect liability at 24 months counted from the CCC date, and removes that cover entirely for an SPA signed after CCC. If you are buying in Phase 4(1) around September 2026, find out whether the CCC has been issued before you sign, and bring your own inspector if it has.

The summary also sets out the early running costs: for the first two years the maintenance charge stays at the lowest point of the developer’s range, and no sinking fund is collected.

Where Impian Hills Sits

The township lies beside Jalan Kota Tinggi, above Ulu Tiram town on the road towards Kota Tinggi, and although the postal code is Ulu Tiram, plans are approved by Majlis Daerah Kota Tinggi. The Senai–Desaru Expressway crosses the corridor to the south, and Plenitude measures the drive to Taman Desa Tebrau, with IKEA, Toppen and AEON Mall Tebrau City, at about 10 km.

Closer to home, the brochure lists SK Ulu Tiram, SMK Ulu Tiram and SJK (C) Tiram, Klinik Kesihatan Ulu Tiram for routine care and Sultan Ismail Hospital for anything more serious. Austin Heights and Crescendo-HELP international schools are on the same list.

About Plenitude

Plenitude Hills Sdn Bhd sits under Plenitude Berhad, a public listed company set up in 2000. Its other Johor housing is at Taman Desa Tebrau, where it built Harp and Cello, and at Impian Hills, Hibiscus came before Astera. Penang buyers may know The Marin at Ferringhi, and the group also owns hotels such as Novotel Kuala Lumpur City Centre.

How It Compares Nearby

The nearest like-for-like option we list is Meadow Heights in Bandar Tiram, another freehold gated double-storey scheme in the same part of Johor. If you like Plenitude but would rather live closer to the city in a condominium, Mandolin Residences at Taman Desa Tebrau is the one to compare. Everything we track here is on the Ulu Tiram new launch page.

Frequently Asked Questions

Is Astera at Impian Hills freehold?

Yes. The houses are freehold, on residential individual titles.

How big are the Astera terraces?

Every lot measures 22 by 70 feet. Type A has a built-up of 1,939 sq ft and Type B 2,141 sq ft, each with four bedrooms.

When can I get the keys?

For Phase 4(1), after the CCC expected in September 2026. For Phase 4(2), vacant possession is targeted for February 2027.

Which local council covers Astera?

Majlis Daerah Kota Tinggi approves the plans, even though the address is 81800 Ulu Tiram.

Can I view a finished house?

Yes, Phase 4(1) is built, and the Impian Hills sales gallery opens daily from 9am to 5pm. PM us and our consultant will set up a viewing right away.

View All Properties Contact Us