AndaBreeze Residences facade artist impression

AndaBreeze Residences Batu Kawan: 1,406 Homes and 2,829 Car Park Bays

Quick answer: AndaBreeze Residences is a freehold development by Pixel Valley in Bandar Cassia, Batu Kawan. Two towers hold 1,406 units on 4.31 acres, from 636 to 1,280 sq ft in two to four bedrooms, with 2,829 residential car park bays — two to three per home. Stated completion is Q2 2030.

Batu Kawan has fourteen current projects. AndaBreeze Residences is the largest still under construction — 1,406 homes in two towers — but the number that actually tells you what kind of place this is sits in the car park.

2,829 residential bays. For 1,406 units. That is two to three bays for most homes, in a market where one bay is normal and two is a selling point.

The car park is the honest description of Batu Kawan

A developer does not build 2,829 bays across nine levels because it is generous. It builds them because the buyers here drive, and will keep driving.

Batu Kawan works on roads. The Batu Kawan Interchange is about a kilometre from the gate, which puts the North–South Expressway a few minutes away. Penang island is roughly 24 km across the Second Penang Bridge. The Batu Kawan Industrial Park — 1,151 acres of manufacturing and technology employment — is the reason most people are here in the first place, and it is a drive, not a walk. The LRT Mutiara Line is planned to serve the area, but it is not operating and no household should plan around it.

So a two-driver family here needs two bays, and a household with a working adult and a college-age child needs three. AndaBreeze is one of the few projects on the mainland that simply gives them that rather than making it a negotiation.

1,406 units, arranged so it does not feel like 1,406

The scale is real. Tower A rises 53 floors and holds 744 units; Tower B rises 46 floors and holds 662. Both sit on a shared podium on 4.31 acres.

What matters for daily life is how that is broken up. Each tower has its own arrival court and its own lobby — Arden for Tower A, Basilica for Tower B — so the two read as separate addresses rather than one building cut in half. Each tower is served by six lifts including the Bomba lift, against 14 to 18 units per floor.

Six lifts per tower is the number to hold on to. It is the difference between a 53-storey building that works at 8 am and one that does not, and it is a specification you cannot change after handover.

Four layouts, and the interesting one is not the biggest

The range runs 636 to 1,280 sq ft across two to four bedrooms:

  • Type B — 636 sq ft, 2 bedrooms, 2 bathrooms. The smallest residential layout in Batu Kawan, and both bedrooms are genuine rooms rather than a study counted as one.
  • Type C — 894 sq ft, 3 bedrooms, 2 bathrooms. Three bedrooms under 900 sq ft, done by keeping circulation tight rather than by shrinking the master. This is the layout most worth walking through before deciding.
  • Type A — 1,023 sq ft, 3 bedrooms, 2 bathrooms. The squarer three-bedroom, with the master set apart from the two secondary rooms and a full-width balcony off the living and dining.
  • Type D — 1,280 sq ft, 4 bedrooms, 3 bathrooms. 13.9 m wide by 9 m deep, bedrooms at both ends with living, dining and kitchen in the middle, so the master wing is genuinely separated.

Ceilings are 10 feet clear, 9 feet in bathrooms — unusually high for a tower of this unit count, and it is what stops a 636 sq ft plan reading as small.

Tower A is released first, so the layouts available now reflect the Tower A stack.

Q2 2030 is the longest wait in Batu Kawan

This is the part to be clear-eyed about. Stated completion is Q2 2030 — later than every other project in the area. Forescape states end of 2029, Wisdom Boulevard Q3/Q4 2029, Viluxe Q4 2028, Versa Q3/Q4 2027. Anggun Residences, Savana Utropolis and Vivo Executive Apartment are already finished.

The project has obtained its APDL, and SPA signing opens when the developer announces it. But a 2030 handover is a five-year horizon from today, and that suits a buyer planning ahead far more than one who needs somewhere to live. If the timeline is the problem rather than the project, the completed and nearer-term options in the same township are the honest alternative.

What is on the podium

Facilities run across three levels — the ground arrival zone, a podium deck on Level 9 and a rooftop deck. The list is long for the area: a 50 m lap pool with a kids pool, wading pool, water slide cove and splash tower; a 355 m jogging track and multi-sport court; fitness lab, yoga studio, sky yoga deck and par course; sea breeze deck and sunset lounge on the roof; mini theatre, music studio, games room, reading room and a study room; gourmet kitchen, private dining room and BBQ pavilion; a co-working corner; kindergarten and several children’s play zones; surau, multipurpose hall and EV charging bays. Security runs five tiers from the entrance guard post to the digital lock at the unit door.

What to check before you shortlist

The land is freehold, the title is commercial under the HDA. Those are two separate facts and both are worth reading in the SPA. A commercial title usually means commercial rates for utilities and assessment.

Confirm the bay count on your specific unit. Two to three bays is the development average, not a promise attached to every layout. Get the allocation for the unit you are looking at in writing.

Ask who is building it. The developer, Pixel Valley Sdn Bhd, came into development from the construction side and is building these towers itself rather than tendering the work out. On a build this size that is worth understanding — ask to see the delivery record on completed projects.

Drive the commute, not the map. The bridge and the interchange both behave differently at 7:30 am than they do on a weekend viewing.

AndaBreeze Residences at a glance

  • Freehold land, commercial title under the HDA
  • 2 towers — Tower A 53 floors / 744 units, Tower B 46 floors / 662 units, 1,406 total on 4.31 acres
  • 636 to 1,280 sq ft, 2 to 4 bedrooms, four layouts
  • 2,829 residential car bays, ground floor to Level 8, plus 130 commercial bays
  • 10 ft clear ceilings; 6 lifts per tower; 14–18 units per floor
  • Persiaran Cassia Barat 3, Bandar Cassia; ~1 km to Batu Kawan Interchange, ~24 km to the island
  • Stated completion Q2 2030; APDL obtained

All four floor plans and the full specification are on the AndaBreeze Residences project page. To see how it sits against everything else in the township, read the Batu Kawan new launch comparison or browse new launches in Batu Kawan — including Vi Residence, Forescape Metrioplace and Seiras Residences. For the wider state view, see the Penang new launch comparison.

Frequently asked questions

How many car park bays does each unit get at AndaBreeze Residences?

The development has 2,829 residential bays from ground floor to Level 8 for 1,406 units, which works out to two or three bays for most homes, plus 130 bays for the commercial lots. Confirm the allocation for your specific unit.

Is AndaBreeze Residences freehold?

Yes. The land is freehold and the units are held under a commercial title governed by the Housing Development Act.

How many towers and units are there?

Two towers, 1,406 units in total. Tower A has 53 floors and 744 units; Tower B has 46 floors and 662 units. Tower A is released first.

What unit sizes are available?

Four layouts: 636 sq ft with 2 bedrooms, 894 sq ft with 3 bedrooms, 1,023 sq ft with 3 bedrooms and 1,280 sq ft with 4 bedrooms.

When will AndaBreeze Residences be completed?

Stated completion is Q2 2030, the latest of any current Batu Kawan project. The APDL has been obtained and SPA signing opens when the developer announces it.

Where exactly is it?

Persiaran Cassia Barat 3, Bandar Cassia, 14110 Batu Kawan, Penang — about 1 km from the Batu Kawan Interchange and roughly 24 km from Penang island via the Second Penang Bridge.

View All Properties Contact Us